Operating Costs

The Project’s projected annual operating costs, at full capacity in year 6 and thereafter, are summarized in Table 7.  The average annual total cost per tonne of finished graphite product is $1,774 per tonne.

 

Table 7: Project Annual Operating Cost Estimates at Full Capacity
 
Mining
Mineral Processing
Product Manufacturing
Integrated Project
Annual OPEX ($US Millions)
$27.7
$29.9
$40.6
$98.2
Annual Production (Tonnes)
1,018,000
60,000
55,350
55,350
Average OPEX per Tonne ($US/Tonne)
          OPEX/t Processing Plant Feed
$27
 
 
 
          OPEX/t Concentrate
 
$498
 
 
          OPEX/t Graphite Product
 
 
$733
$1,774
1 The mining energy cost is included in Processing Plant cost 