Operating Costs
The Project’s projected annual operating costs, at full capacity in year 6 and thereafter, are summarized in Table 7. The average annual total cost per tonne of finished graphite product is $1,774 per tonne.
Table 7: Project Annual Operating Cost Estimates at Full Capacity
|
||||
---|---|---|---|---|
Mining
|
Mineral Processing
|
Product Manufacturing
|
Integrated Project
|
|
Annual OPEX ($US Millions) |
$27.7
|
$29.9
|
$40.6
|
$98.2
|
Annual Production (Tonnes) |
1,018,000
|
60,000
|
55,350
|
55,350
|
Average OPEX per Tonne ($US/Tonne) | ||||
OPEX/t Processing Plant Feed |
$27
|
|
|
|
OPEX/t Concentrate |
|
$498
|
|
|
OPEX/t Graphite Product |
|
|
$733
|
$1,774
|
1 The mining energy cost is included in Processing Plant cost |